IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1806 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,221 $0 n/a
UK1806 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $10,567 $9,500 n/a
UK1806 # 13 Y:2018 13 2018 USE PLASTIC PALLETS INSTEAD OF WOOD $8,000 $18,890 n/a
UK1806 # 12 Y:2018 12 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,467 $0 n/a
UK1806 # 11 Y:2018 11 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $3,087 $775 n/a
UK1806 # 10 Y:2018 10 2018 OPTIMIZE PLANT POWER FACTOR $6,117 $6,090 n/a
UK1806 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,069 $4,175 n/a
UK1806 # 08 Y:2018 08 2018 USE PHOTOCELL CONTROLS $1,514 $2,900 n/a
UK1806 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,583 $99,639 n/a
UK1806 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $456 $0 n/a
UK1806 # 05 Y:2018 05 2018 USE RADIANT HEATER FOR SPOT HEATING $14,227 $14,700 n/a
UK1806 # 04 Y:2018 04 2018 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,440 $18,575 n/a
UK1806 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,312 $1,100 n/a
UL0157 # 08 Y:1996 08 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $11,808 $0 Not Implemented
UL0157 # 07 Y:1996 07 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,714 $600 Not Implemented
UL0157 # 06 Y:1996 06 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $10,233 $0 Not Implemented
UL0157 # 05 Y:1996 05 1996 INSTALL TIMERS AND/OR THERMOSTATS $553 $200 Not Implemented
UL0157 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $330 $230 Not Implemented
UL0157 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $951 $87 Not Implemented
UL0157 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $81 $2,160 Not Implemented
UL0157 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,049 $1,157 Not Implemented
UL0156 # 07 Y:1996 07 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,136 $0 Not Implemented
UL0156 # 06 Y:1996 06 1996 RECYCLE CASTING SAND $151 $0 Not Implemented
UL0156 # 05 Y:1996 05 1996 INSTALL STORM WINDOWS AND DOORS $1,928 $2,000 Not Implemented
UL0156 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $694 $20 Not Implemented