IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1062 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,554 $0 Implemented
OK1062 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,294 $2,732 Implemented
OK1062 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,957 $30,186 Implemented
OK1062 # 03 Y:2022 03 2022 USE RADIANT HEATER FOR SPOT HEATING $12,930 $48,590 Not Implemented
OK1062 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $101 $580 Implemented
OK1052 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,322 $0 Not Implemented
OK1052 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $2,203 $586 Not Implemented
OK1052 # 02 Y:2021 02 2021 USE RADIANT HEATER FOR SPOT HEATING $4,517 $19,500 Not Implemented
OK1052 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $1,512 $6,000 Not Implemented
OK1052 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,648 $13,284 Implemented
OK0848 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,741 $0 Not Implemented
OK0848 # 07 Y:2013 07 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $546 $540 Implemented
OK0848 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,100 $4,500 Implemented
OK0848 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,981 $15,725 Not Implemented
OK0848 # 04 Y:2013 04 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,477 $6,160 Implemented
OK0848 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $5,376 Implemented
OK0848 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,511 $6,889 Not Implemented
OK0761 # 05 Y:2008 05 2008 $5,200 $0 Implemented
OK0761 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $14,263 $4,638 Implemented
OK0761 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $525 $2,871 Implemented
OK0761 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,213 $0 Implemented
OK0761 # 04 Y:2008 04 2008 INSTALL SET-BACK TIMERS $3,105 $1,908 Implemented
OK0744 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,427 $8,720 Not Implemented
OK0744 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,080 $360 Not Implemented
OK0744 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,247 $2,398 Not Implemented