IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0360 # 02 Y:1999 02 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,360 $0 Implemented
AM0360 # 03 Y:1999 03 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,140 $0 Implemented
AM0360 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,100 $500 Implemented
AM0360 # 05 Y:1999 05 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,090 $0 Implemented
AM0360 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $420 $200 Implemented
AM0360 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $190 $110 Implemented
AM0360 # 08 Y:1999 08 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $100 $0 Implemented
AM0360 # 01 Y:1999 01 1999 USE RADIANT HEATER FOR SPOT HEATING $13,800 $12,800 Implemented
MO0264 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $949 $1,518 Implemented
MO0264 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $960 $300 Implemented
MO0264 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,752 $40 Not Implemented
MO0264 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,289 $62 Not Implemented
MO0264 # 06 Y:1999 06 1999 $8,000 $2,000 Not Implemented
MO0264 # 07 Y:1999 07 1999 $4,000 $700 Not Implemented
MO0264 # 05 Y:1999 05 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,600 $0 Implemented
KU0522 # 05 Y:1999 05 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,710 $1,100 Implemented
KU0522 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $250 $500 Not Implemented
KU0522 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,170 $710 Implemented
KU0522 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,840 $1,410 Not Implemented
KU0522 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $470 $0 Implemented
KU0522 # 06 Y:1999 06 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $2,600 $4,500 Implemented
DS0143 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,043 $640 Implemented
DS0143 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $16,588 $20 Not Implemented
DS0143 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $16,788 $3,567 Not Implemented
DS0143 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,400 Implemented