Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0056 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $325 | $121 | Implemented |
UU0056 # 01 Y:2003 | 01 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $335 | $1,600 | Not Implemented |
UU0056 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $58 | Implemented |
UU0056 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $223 | $136 | Not Implemented |
UU0056 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $190 | $266 | Not Implemented |
UU0056 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $110 | $490 | Implemented |
MS0233 # 02 Y:2003 | 02 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $67,762 | $79,500 | Not Implemented |
MS0233 # 09 Y:2003 | 09 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $579 | $968 | Implemented |
MS0233 # 07 Y:2003 | 07 | 2003 | USE SYNTHETIC LUBRICANT | $3,787 | $1,210 | Implemented |
MS0233 # 01 Y:2003 | 01 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $200,928 | $9,650 | Implemented |
MS0233 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,274 | $21,420 | Implemented |
MS0233 # 04 Y:2003 | 04 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,291 | $36,800 | Implemented |
MS0233 # 05 Y:2003 | 05 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $11,372 | $2,900 | Implemented |
MS0233 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,999 | $748 | Implemented |
MS0233 # 08 Y:2003 | 08 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,622 | $1,535 | Not Implemented |
UU0047 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,212 | $710 | Implemented |
UU0047 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,536 | $4,800 | Not Implemented |
UU0047 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,044 | $9,000 | Implemented |
UU0047 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,693 | $0 | Not Implemented |
UU0047 # 05 Y:2003 | 05 | 2003 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $3,430 | $7,126 | Not Implemented |
UU0047 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $301 | $150 | Implemented |
UU0047 # 07 Y:2003 | 07 | 2003 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $4,941 | $765 | Not Implemented |
SD0326 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,795 | $384 | Not Implemented |
SD0326 # 04 Y:2003 | 04 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $14,893 | $7,700 | Not Implemented |
SD0326 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,861 | $20,000 | Not Implemented |