Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84
matching recommendationsSIC | 3444 | Sheet Metalwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0360 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,834 | $5,300 | n/a |
MZ0360 # 02 Y:2024 | 02 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $8,851 | $11,852 | n/a |
MZ0360 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,978 | $18,853 | n/a |
MZ0360 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,193 | $8,300 | n/a |
MZ0251 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $862 | $1,160 | Implemented |
MZ0251 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,153 | $6,140 | Implemented |
MZ0251 # 01 Y:2018 | 01 | 2018 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $22,536 | $32,400 | Not Implemented |
MZ0251 # 04 Y:2018 | 04 | 2018 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,719 | $36,000 | Not Implemented |
MZ0251 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $688 | $75 | Implemented |
MZ0251 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,018 | $0 | Implemented |
MZ0186 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $83 | $0 | Implemented |
MZ0186 # 02 Y:2015 | 02 | 2015 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $5,641 | $18,600 | Not Implemented |
MZ0186 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $5,513 | $5,100 | Implemented |
MZ0186 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,104 | $1,160 | Implemented |
MZ0027 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,444 | $30,600 | Not Implemented |
MZ0027 # 02 Y:2008 | 02 | 2008 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $514 | $1,400 | Not Implemented |
MZ0027 # 04 Y:2008 | 04 | 2008 | USE OPTIMUM THICKNESS INSULATION | $76 | $300 | Not Implemented |
MZ0027 # 06 Y:2008 | 06 | 2008 | HEAT WATER WITH EXHAUST HEAT | $9,936 | $10,000 | Not Implemented |
MZ0027 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,642 | $900 | Not Implemented |
MZ0027 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,465 | $1,400 | Not Implemented |
MZ0022 # 04 Y:2008 | 04 | 2008 | ELIMINATE/REDUCE AN OPERATION | $41,408 | $0 | Implemented |
MZ0022 # 03 Y:2008 | 03 | 2008 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $11,853 | $5,458 | Implemented |
MZ0022 # 02 Y:2008 | 02 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $382 | $900 | Implemented |
MZ0022 # 01 Y:2008 | 01 | 2008 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $1,425 | $2,800 | Implemented |
MO0222 # 09 Y:1998 | 09 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $502 | $46 | Not Implemented |