IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0252 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,590 $12,314 Not Implemented
AS0252 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,693 $59,800 Not Implemented
AS0252 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,350 $16,625 Not Implemented
AS0250 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $14,688 $12,256 Not Implemented
AS0250 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $696 Not Implemented
AS0250 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,274 $1,040 Not Implemented
AS0250 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,741 $120 Implemented
AS0250 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,394 $1,000 Implemented
AS0250 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $720 $30 Not Implemented
AS0250 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,967 $180 Not Implemented
AS0219 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $101 $268 Implemented
AS0219 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,983 $10,352 Not Implemented
AS0219 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $72,920 $15,300 Not Implemented
AS0219 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $36 $30 Implemented
AS0219 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $1,500 Implemented
AS0219 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,138 $2,957 Implemented
AS0219 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,071 $60 Implemented
AS0219 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $2,888 Implemented
AS0158 # 06 Y:1995 06 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,112 $18,838 Not Implemented
AS0158 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,900 $2,900 Implemented
AS0158 # 02 Y:1995 02 1995 USE SYNTHETIC LUBRICANT $4,212 $2,834 Not Implemented
AS0158 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $855 $200 Not Implemented
AS0158 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,243 $9,227 Not Implemented
AS0158 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,179 $0 Not Implemented
AS0158 # 07 Y:1995 07 1995 INSTALL TIMERS AND/OR THERMOSTATS $784 $1,250 Not Implemented