IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,504

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0324 # 02 Y:1998 02 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $487 $0 Implemented
WI0324 # 03 Y:1998 03 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,780 $850 Not Implemented
WI0324 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,054 $400 Implemented
WI0324 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $381 $90 Implemented
WI0324 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $372 $640 Implemented
WI0324 # 07 Y:1998 07 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,039 $0 Not Implemented
WI0319 # 01 Y:1998 01 1998 INSTALL SENSORS TO DETECT DEFECTS $69,212 $63,760 Not Implemented
WI0319 # 02 Y:1998 02 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $6,046 $13,200 Not Implemented
WI0319 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,599 $18,400 Not Implemented
WI0319 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,295 $940 Not Implemented
WI0319 # 05 Y:1998 05 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,187 $500 Not Implemented
WI0319 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $214 $0 Implemented
AS0219 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $2,888 Implemented
AS0219 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $101 $268 Implemented
AS0219 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,071 $60 Implemented
AS0219 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,138 $2,957 Implemented
AS0219 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $1,500 Implemented
AS0219 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $36 $30 Implemented
AS0219 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $72,920 $15,300 Not Implemented
AS0219 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,983 $10,352 Not Implemented
MO0222 # 01 Y:1998 01 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $16,288 $3,700 Implemented
MO0222 # 02 Y:1998 02 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $14,171 $25,000 Implemented
MO0222 # 03 Y:1998 03 1998 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $12,629 $30,000 Implemented
MO0222 # 04 Y:1998 04 1998 AIR CONDITION ONLY SPACE NECESSARY $3,000 $5,000 Not Implemented
MO0222 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,250 $5,000 Implemented