IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0091 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,051 $230 Implemented
WM0091 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,795 $1,501 Not Implemented
WM0091 # 04 Y:2016 04 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,722 $0 Not Implemented
WM0091 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,746 $1,275 Not Implemented
WM0091 # 02 Y:2016 02 2016 COMBINE UTILITY METERS $8,777 $30,000 Not Implemented
WM0091 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $1,383 $560 Not Implemented
WM0091 # 01 Y:2016 01 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $12,568 $2,860 Not Implemented
WM0019 # 06 Y:2013 06 2013 INSTALL REPLACEMENT DOORS $494 $1,300 Not Implemented
WM0019 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,985 $763 Not Implemented
WM0019 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,791 $1,350 Implemented
WM0019 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $0 Implemented
WM0019 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,135 $6,210 Not Implemented
WM0019 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,444 $510 Implemented
WM0002 # 06 Y:2012 06 2012 UPGRADE CONTROLS ON COMPRESSORS $11,459 $0 Not Implemented
WM0002 # 07 Y:2012 07 2012 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,884 $0 Implemented
WM0002 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $243 $30 Not Implemented
WM0002 # 01 Y:2012 01 2012 USE POWER DURING OFF-PEAK PERIODS $56,454 $0 Not Implemented
WM0002 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,844 $55,770 Implemented
WM0002 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $1,425 $500 Not Implemented
WM0002 # 02 Y:2012 02 2012 USE PHOTOCELL CONTROLS $875 $750 Not Implemented
WI0340 # 03 Y:1999 03 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,819 $6,000 Not Implemented
WI0340 # 08 Y:1999 08 1999 COMBINE UTILITY METERS $246 $200 Not Implemented
WI0340 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,153 $30,618 Implemented
WI0340 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $2,000 Implemented
WI0340 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $470 $150 Implemented