Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
384
matching recommendationsSIC | 3448 | Prefabricated Metal Buildings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0343 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,284 | $4,000 | n/a |
TT0343 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,928 | $289,763 | n/a |
TT0343 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,652 | $3,850 | n/a |
TT0343 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,788 | $4,000 | n/a |
TT0343 # 08 Y:2025 | 08 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $293 | $170 | n/a |
TT0343 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,446 | $1,500 | n/a |
TT0343 # 01 Y:2025 | 01 | 2025 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $106,940 | $8,000 | n/a |
TT0343 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,402 | $1,500 | n/a |
WV0666 # 04 Y:2024 | 04 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $445 | $1,367 | Implemented |
WV0666 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $859 | $3,565 | Implemented |
WV0666 # 01 Y:2024 | 01 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,346 | $19,500 | Not Implemented |
WV0666 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,679 | $5,920 | Not Implemented |
WV0666 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $84 | $100 | Implemented |
WV0666 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $260 | $640 | Implemented |
NL0081 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $157 | $225 | Not Implemented |
NL0081 # 01 Y:2023 | 01 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $497,815 | $199,200 | Implemented |
NL0081 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,819 | $5,000 | Implemented |
NL0081 # 08 Y:2023 | 08 | 2023 | USE PHOTOCELL CONTROLS | $54 | $57 | Not Implemented |
NL0081 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,605 | $20,000 | Implemented |
NL0081 # 06 Y:2023 | 06 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $937 | $1,210 | Not Implemented |
NL0081 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $7,826 | $12,000 | Not Implemented |
NL0081 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,139 | $3,320 | Not Implemented |
UF0587 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,086 | $356 | Implemented |
UF0587 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,229 | $0 | Not Implemented |
UF0587 # 02 Y:2022 | 02 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,027 | $20,000 | Not Implemented |