IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
Reset
SIC 3448 Prefabricated Metal Buildings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0666 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $859 $3,565 n/a
WV0666 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $84 $100 n/a
WV0666 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $260 $640 n/a
WV0666 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,679 $5,920 n/a
WV0666 # 04 Y:2024 04 2024 DEVELOP A REPAIR/REPLACE POLICY $445 $1,367 n/a
WV0666 # 01 Y:2024 01 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,346 $19,500 n/a
NL0081 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,605 $20,000 Implemented
NL0081 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $497,815 $199,200 Implemented
NL0081 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $7,826 $12,000 Not Implemented
NL0081 # 08 Y:2023 08 2023 USE PHOTOCELL CONTROLS $54 $57 Not Implemented
NL0081 # 06 Y:2023 06 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $937 $1,210 Not Implemented
NL0081 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157 $225 Not Implemented
NL0081 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,819 $5,000 Implemented
NL0081 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,139 $3,320 Not Implemented
UF0587 # 08 Y:2022 08 2022 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,274 $0 Implemented
UF0587 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,312 $11,024 Not Implemented
UF0587 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,229 $0 Not Implemented
UF0587 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,086 $356 Implemented
UF0587 # 07 Y:2022 07 2022 IMPROVE SPACE COMFORT CONDITIONING $15,247 $4,480 Implemented
UF0587 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $133,034 $448,875 Not Implemented
UF0587 # 04 Y:2022 04 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,425 $36,450 Not Implemented
UF0587 # 02 Y:2022 02 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,027 $20,000 Not Implemented
SF0592 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,009 $0 Implemented
SF0592 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,569 $0 Implemented
SF0592 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $13,506 $24,333 Implemented