Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
376
matching recommendationsSIC | 3448 | Prefabricated Metal Buildings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0666 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $859 | $3,565 | n/a |
WV0666 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $84 | $100 | n/a |
WV0666 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $260 | $640 | n/a |
WV0666 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,679 | $5,920 | n/a |
WV0666 # 04 Y:2024 | 04 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $445 | $1,367 | n/a |
WV0666 # 01 Y:2024 | 01 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,346 | $19,500 | n/a |
NL0081 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,605 | $20,000 | Implemented |
NL0081 # 01 Y:2023 | 01 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $497,815 | $199,200 | Implemented |
NL0081 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $7,826 | $12,000 | Not Implemented |
NL0081 # 08 Y:2023 | 08 | 2023 | USE PHOTOCELL CONTROLS | $54 | $57 | Not Implemented |
NL0081 # 06 Y:2023 | 06 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $937 | $1,210 | Not Implemented |
NL0081 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $157 | $225 | Not Implemented |
NL0081 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,819 | $5,000 | Implemented |
NL0081 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,139 | $3,320 | Not Implemented |
UF0587 # 08 Y:2022 | 08 | 2022 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $5,274 | $0 | Implemented |
UF0587 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,312 | $11,024 | Not Implemented |
UF0587 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,229 | $0 | Not Implemented |
UF0587 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,086 | $356 | Implemented |
UF0587 # 07 Y:2022 | 07 | 2022 | IMPROVE SPACE COMFORT CONDITIONING | $15,247 | $4,480 | Implemented |
UF0587 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $133,034 | $448,875 | Not Implemented |
UF0587 # 04 Y:2022 | 04 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,425 | $36,450 | Not Implemented |
UF0587 # 02 Y:2022 | 02 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,027 | $20,000 | Not Implemented |
SF0592 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,009 | $0 | Implemented |
SF0592 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,569 | $0 | Implemented |
SF0592 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $13,506 | $24,333 | Implemented |