IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
SIC 3448 Prefabricated Metal Buildings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0587 # 04 Y:2022 04 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,425 $36,450 Not Implemented
UF0587 # 07 Y:2022 07 2022 IMPROVE SPACE COMFORT CONDITIONING $15,247 $4,480 Implemented
UF0587 # 08 Y:2022 08 2022 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,274 $0 Implemented
UF0587 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $133,034 $448,875 Not Implemented
UF0587 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,086 $356 Implemented
SF0592 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,009 $0 Implemented
SF0592 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,682 $0 Implemented
SF0592 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,309 $1,263 Implemented
SF0592 # 06 Y:2023 06 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $8,739 $30,000 Implemented
SF0592 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,569 $0 Implemented
SF0592 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $13,506 $24,333 Implemented
UD1048 # 08 Y:2022 08 2022 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $573 $1,065 Not Implemented
UD1048 # 03 Y:2022 03 2022 DISCONNECT BALLASTS $1,787 $0 Implemented
UD1048 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,915 $625 Not Implemented
UD1048 # 01 Y:2022 01 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,150 $1,500 Not Implemented
UD1048 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,481 $35 Not Implemented
UD1048 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,039 $0 Not Implemented
UD1048 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,115 $1,409 Not Implemented
UD1048 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $952 Not Implemented
MZ0310 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,250 $2,580 Not Implemented
MZ0310 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,274 $490 Not Implemented
MZ0310 # 02 Y:2021 02 2021 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $3,630 $1,160 Not Implemented
MZ0310 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,165 $1,896 Not Implemented
AM0762 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,800 $11,610 Implemented
AM0762 # 08 Y:2018 08 2018 KEEP EQUIPMENT CLEAN $730 $50 Implemented