IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,045

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0287 # 07 Y:2006 07 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,437 $1,550 Not Implemented
MS0287 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,052 $213 Not Implemented
MS0287 # 09 Y:2006 09 2006 AIR CONDITION ONLY SPACE NECESSARY $538 $400 Not Implemented
LM0101 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,671 $0 Not Implemented
LM0101 # 02 Y:2005 02 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $200,454 $75,500 Not Implemented
LM0101 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,320 $1,178 Not Implemented
LM0101 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,490 $18,642 Implemented
LM0101 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,390 $1,225 Implemented
UM0282 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,587 $640 Not Implemented
UM0282 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,689 $5,736 Not Implemented
UM0282 # 03 Y:2005 03 2005 COVER OPEN TANKS $2,342 $3,510 Not Implemented
UM0282 # 04 Y:2005 04 2005 MINIMIZE WATER USAGE $2,142 $1,262 Not Implemented
UM0282 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,738 $1,000 Not Implemented
UM0282 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,070 $1,938 Not Implemented
UM0282 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $476 $276 Not Implemented
UM0282 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $344 $225 Not Implemented
TA0091 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,915 $975 Not Implemented
TA0091 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,600 $4,390 Not Implemented
TA0091 # 03 Y:2005 03 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,910 $2,332 Not Implemented
TA0091 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,750 $190 Not Implemented
TA0091 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $892 $117 Not Implemented
TA0091 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $520 $15 Not Implemented
LM0090 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,633 $0 Not Implemented
LM0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $429 $280 Implemented
LM0090 # 03 Y:2005 03 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,100 $0 Not Implemented