Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,045
matching recommendationsSIC | 345 | Screw Machine Products, Bolts, Etc. |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0366 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $1,894 | $600 | Not Implemented |
ND0366 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $561 | $350 | Not Implemented |
ND0366 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,250 | $160 | Implemented |
AS0281 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $895 | $2,709 | Not Implemented |
AS0281 # 02 Y:2000 | 02 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $581 | $600 | Not Implemented |
AS0281 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,825 | $3,713 | Not Implemented |
AS0281 # 04 Y:2000 | 04 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,723 | $4,950 | Not Implemented |
AS0281 # 05 Y:2000 | 05 | 2000 | USE EVAPORATION TO CONCENTRATE MATERIAL | $8,037 | $8,525 | Implemented |
AS0281 # 06 Y:2000 | 06 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $456 | $60 | Implemented |
AS0281 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,476 | $60 | Not Implemented |
AS0281 # 08 Y:2000 | 08 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $8,782 | $9,600 | Not Implemented |
AS0281 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $31,250 | $15,000 | Not Implemented |
UM0165 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,237 | $9,748 | Implemented |
UM0165 # 02 Y:2000 | 02 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,860 | $0 | Implemented |
UM0165 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,996 | $1,750 | Implemented |
UM0165 # 04 Y:2000 | 04 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,852 | $13,583 | Not Implemented |
UM0165 # 05 Y:2000 | 05 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $26,506 | $131,000 | Not Implemented |
UM0165 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $658 | $750 | Not Implemented |
UM0165 # 07 Y:2000 | 07 | 2000 | FILTER AND REUSE HYDRAULIC OIL | $37,145 | $10,500 | Not Implemented |
WI0370 # 01 Y:2000 | 01 | 2000 | CLEAR AND RENT EXISTING SPACE | $34,613 | $0 | Not Implemented |
WI0370 # 02 Y:2000 | 02 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $30,575 | $2,955 | Not Implemented |
WI0370 # 03 Y:2000 | 03 | 2000 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $3,255 | $0 | Implemented |
WI0370 # 04 Y:2000 | 04 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,441 | $7,400 | Not Implemented |
WI0370 # 05 Y:2000 | 05 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,130 | $0 | Not Implemented |
WI0370 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,218 | $740 | Not Implemented |