IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,045

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0141 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,412 $1,200 Not Implemented
SD0141 # 03 Y:1996 03 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,057 $2,600 Not Implemented
SD0141 # 04 Y:1996 04 1996 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $7,840 $6,000 Not Implemented
AS0171 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,051 $9,221 Implemented
AS0171 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,958 $20,409 Implemented
AS0171 # 03 Y:1996 03 1996 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,351 $300 Not Implemented
AS0171 # 04 Y:1996 04 1996 USE SYNTHETIC LUBRICANT $2,194 $2,577 Implemented
AS0171 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $4,044 $3,141 Implemented
AS0171 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,104 $0 Not Implemented
AS0171 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,065 $0 Not Implemented
AS0171 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,707 $1,101 Not Implemented
UD0486 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $558 $0 Implemented
UD0486 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,870 $0 Implemented
UD0486 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $360 $1,000 Implemented
UD0486 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,390 $7,435 Implemented
UD0486 # 05 Y:1996 05 1996 RECOVER AND REUSE COOLING WATER $2,850 $17,500 Implemented
WV0078 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,384 $5,486 Implemented
WV0078 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,296 $16,080 Implemented
WV0078 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,694 $3,000 Not Implemented
WV0078 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,326 $360 Not Implemented
WV0078 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,702 $630 Implemented
WV0078 # 06 Y:1996 06 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,506 $1,200 Implemented
WV0078 # 07 Y:1996 07 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,838 $7,000 Not Implemented
HO0123 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $2,534 $200 Implemented
HO0123 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,424 $10,340 Implemented