IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,045

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0087 # 07 Y:1990 07 1990 INSTALL STORM WINDOWS AND DOORS $344 $1,134 Implemented
WI0087 # 08 Y:1990 08 1990 INSTALL SET-BACK TIMERS $386 $400 Implemented
WI0087 # 09 Y:1990 09 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $285 $0 Implemented
RU0087 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,222 $9,000 Not Implemented
RU0087 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,858 $68 Not Implemented
RU0087 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $650 Not Implemented
RU0087 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,016 $0 Not Implemented
RU0087 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,717 $3,492 Not Implemented
RU0087 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,877 $1,200 Not Implemented
RU0087 # 07 Y:1990 07 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $626 $170 Not Implemented
RU0087 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $150 $500 Not Implemented
WI0081 # 01 Y:1990 01 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,466 $5,000 Not Implemented
WI0081 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $9,520 $1,250 Implemented
WI0081 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $5,028 $1,500 Implemented
WI0081 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,686 $1,500 Implemented
WI0081 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $1,478 $200 Not Implemented
WI0081 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,870 $6,070 Implemented
WI0081 # 07 Y:1990 07 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $247 $0 Not Implemented
WI0081 # 08 Y:1990 08 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $0 Implemented
CO0167 # 01 Y:1989 01 1989 OPTIMIZE PLANT POWER FACTOR $6,740 $6,800 Implemented
CO0167 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $150 Implemented
CO0167 # 03 Y:1989 03 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,800 $2,500 Not Implemented
CO0167 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,345 $1,000 Not Implemented
CO0167 # 05 Y:1989 05 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,200 $1,900 Not Implemented
CO0167 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $335 Implemented