Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product FASTENERS
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $5,000,000-$10,000,000
# of Employees 102
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,575 908,265 kWh $0.09
Natural Gas $60,503 13,409 MMBtu $4.51
TOTAL ENERGY COSTS $146,078
RECOMMENDED SAVINGS* $6,052 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,052
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,400
Cost:
$10,000
$2,400 - - - $2,400
-
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$893
Cost:
$232
$893 9,379 - - $893
9,379
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,190
Cost:
$400
$1,190 12,603 - - $1,190
12,603
kWh
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$487
Cost:
$250
- - $487 108 -
-
kWh
$487
108
MMBtu
05: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$758
Cost:
$2,514
- - $758 168 -
-
kWh
$758
168
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$53
Cost:
$190
$53 586 - - $53
586
kWh
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$271
Cost:
$117
- - $271 60 -
-
kWh
$271
60
MMBtu
TOTAL RECOMMENDED Savings:
$6,052
Cost:
$13,703
$4,536 22,568 $1,516 336 $4,536
22,568
kWh
$1,516
336
MMBtu
TOTAL IMPLEMENTED Savings:
$6,052
Cost:
$13,703
$4,536 22,568 $1,516 336 $4,536
22,568
kWh
$1,516
336
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas