IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,045

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0446 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,065 $20 Not Implemented
BD0446 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $510 $900 Not Implemented
BD0446 # 09 Y:2014 09 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $366 $800 Not Implemented
UA0120 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,979 $24,613 Implemented
UA0120 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,756 $800 Not Implemented
UA0120 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,394 $5,695 Implemented
UA0120 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $4,402 $160 Not Implemented
UA0120 # 05 Y:2014 05 2014 MODIFY STARTUP/SHUTDOWN TIMES $3,313 $0 Not Implemented
MZ0138 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $871 $620 Not Implemented
MZ0138 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $557 $1,075 Implemented
MZ0138 # 03 Y:2014 03 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,006 $15,000 Not Implemented
MZ0138 # 04 Y:2014 04 2014 AIR CONDITION ONLY SPACE NECESSARY $3,570 $0 Not Implemented
MZ0138 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $358 $0 Implemented
BD0436 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $3,206 $6,300 Not Implemented
BD0436 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $2,974 $1,500 Implemented
BD0436 # 03 Y:2013 03 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,260 $40 Not Implemented
BD0436 # 04 Y:2013 04 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $918 $470 Not Implemented
BD0436 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $238 $20 Not Implemented
UM0422 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,550 $15,331 Not Implemented
UM0422 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,633 $500 Implemented
UM0422 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,593 $14,120 Implemented
LE0363 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,031 $85,300 Implemented
LE0363 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $13,013 Not Implemented
LE0363 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,725 $20,280 Not Implemented
LE0363 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,978 $1,000 Implemented