Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 345 | Screw Machine Products, Bolts, Etc. |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0414 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $754 | $350 | Implemented |
WI0414 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $1,071 | $2,400 | Implemented |
WI0414 # 06 Y:2002 | 06 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,971 | $0 | Not Implemented |
WI0414 # 05 Y:2002 | 05 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,560 | $1,033 | Not Implemented |
WI0414 # 04 Y:2002 | 04 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,730 | $0 | Implemented |
WI0414 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,225 | $0 | Implemented |
WI0414 # 02 Y:2002 | 02 | 2002 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $6,619 | $14,000 | Not Implemented |
WI0414 # 01 Y:2002 | 01 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,469 | $1,800 | Not Implemented |
WI0207 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,229 | $3,840 | Not Implemented |
WI0207 # 11 Y:1994 | 11 | 1994 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,000 | $10,000 | Not Implemented |
WI0207 # 10 Y:1994 | 10 | 1994 | RECYCLE CLEANING SOLVENT AND REUSE | $15,300 | $21,000 | Not Implemented |
WI0207 # 09 Y:1994 | 09 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $408 | $0 | Not Implemented |
WI0207 # 08 Y:1994 | 08 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $708 | $820 | Implemented |
WI0207 # 07 Y:1994 | 07 | 1994 | COVER OPEN TANKS | $1,852 | $288 | Not Implemented |
WI0207 # 06 Y:1994 | 06 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $186 | $528 | Not Implemented |
WI0207 # 05 Y:1994 | 05 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $325 | $0 | Not Implemented |
WI0207 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,382 | $8,346 | Implemented |
WI0207 # 03 Y:1994 | 03 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,970 | $600 | Not Implemented |
WI0207 # 01 Y:1994 | 01 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,556 | $6,000 | Implemented |
WI0031 # 01 Y:1988 | 01 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,758 | $3,500 | Not Implemented |
WI0031 # 02 Y:1988 | 02 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,808 | $500 | Implemented |
WI0031 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,157 | $454 | Not Implemented |
WI0031 # 04 Y:1988 | 04 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,548 | $2,500 | Implemented |
WI0031 # 05 Y:1988 | 05 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,507 | $0 | Not Implemented |
WI0031 # 06 Y:1988 | 06 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,350 | $2,300 | Implemented |