Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 345 | Screw Machine Products, Bolts, Etc. |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0330 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,782 | $1,425 | Not Implemented |
WV0275 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,244 | $8,370 | Implemented |
WV0275 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,654 | $800 | Implemented |
WV0275 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,308 | $0 | Implemented |
WV0275 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,337 | $7,217 | Not Implemented |
WV0275 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,752 | $1,110 | Not Implemented |
WV0275 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $29,059 | $900 | Implemented |
WV0275 # 01 Y:2003 | 01 | 2003 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $277,857 | $145,760 | Not Implemented |
SD0330 # 06 Y:2003 | 06 | 2003 | AUTOMATE FINISHING PROCESS | $96,800 | $200,000 | Not Implemented |
SD0330 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,500 | $10,000 | Not Implemented |
SD0330 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $887 | $80 | Implemented |
SD0330 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,836 | $4,000 | Not Implemented |
SD0330 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,189 | $6,000 | Not Implemented |
WV0275 # 10 Y:2003 | 10 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,549 | $500 | Implemented |
WV0275 # 14 Y:2003 | 14 | 2003 | INSTALL OCCUPANCY SENSORS | $2,336 | $1,200 | Implemented |
WV0275 # 13 Y:2003 | 13 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,716 | $1,300 | Not Implemented |
WV0275 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,170 | $360 | Implemented |
WV0275 # 09 Y:2003 | 09 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,345 | $1,860 | Not Implemented |
WV0275 # 11 Y:2003 | 11 | 2003 | BURN WASTE OIL FOR HEAT | $9,135 | $3,600 | Not Implemented |
WV0275 # 12 Y:2003 | 12 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,440 | $1,200 | Not Implemented |
OK0662 # 08 Y:2003 | 08 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,730 | $1,000 | Not Implemented |
OK0662 # 07 Y:2003 | 07 | 2003 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,701 | $1,011 | Not Implemented |
OK0662 # 06 Y:2003 | 06 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,326 | $23,100 | n/a |
OK0662 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $165 | $864 | Not Implemented |
OK0662 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $181 | $300 | Not Implemented |