IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

382

matching recommendations
Reset
SIC 3451 Screw Machine Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0154 # 07 Y:2015 07 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $18,315 $226,000 Not Implemented
UD0918 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $537 $1,000 Implemented
UD0918 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,773 $4,785 Implemented
UD0918 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,952 $45,000 Not Implemented
UD0918 # 06 Y:2015 06 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,416 $23,545 Not Implemented
UD0918 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,325 $0 Implemented
UD0918 # 04 Y:2015 04 2015 DEVELOP A REPAIR/REPLACE POLICY $58,864 $75,499 Implemented
UD0918 # 03 Y:2015 03 2015 USE RADIANT HEATER FOR SPOT HEATING $4,208 $1,050 Not Implemented
UD0918 # 02 Y:2015 02 2015 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,098 $0 Not Implemented
UD0918 # 01 Y:2015 01 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,159 $700 Not Implemented
UM0422 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,593 $14,120 Implemented
UM0422 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,633 $500 Implemented
UM0422 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,550 $15,331 Not Implemented
SU0342 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $344 $1,388 Implemented
SU0342 # 03 Y:2013 03 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $211 $914 Not Implemented
SU0342 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $92 Not Implemented
SU0342 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,615 $620 Not Implemented
LL0344 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,150 $1,360 Implemented
LL0344 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $151 $156 Not Implemented
LL0344 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $699 $480 Implemented
LL0344 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,425 $575 Implemented
LL0344 # 03 Y:2011 03 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,859 $210 Implemented
LL0344 # 01 Y:2011 01 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,757 $630 Implemented
WV0380 # 14 Y:2008 14 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $807 $4,400 Not Implemented
WV0380 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $18,045 $7,420 Not Implemented