Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
259
matching recommendationsSIC | 3452 | Bolts, Nuts, Rivets, And Washers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0354 # 01 Y:2019 | 01 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $42,517 | $105,476 | Implemented |
MI0354 # 11 Y:2019 | 11 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $218 | $559 | Implemented |
MI0354 # 10 Y:2019 | 10 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $538 | $951 | Implemented |
MI0354 # 05 Y:2019 | 05 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,590 | $8,800 | Implemented |
MI0354 # 07 Y:2019 | 07 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $1,687 | $240 | Implemented |
WV0561 # 07 Y:2018 | 07 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $471 | $696 | Implemented |
WV0561 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,102 | $13,629 | Implemented |
WV0561 # 08 Y:2018 | 08 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $321 | $34 | Implemented |
WV0561 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,765 | $1,784 | Implemented |
WV0561 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,742 | $171 | Implemented |
WV0561 # 01 Y:2018 | 01 | 2018 | INSTALL SET-BACK TIMERS | $15,007 | $2,522 | Implemented |
WV0561 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $535 | $1,400 | Implemented |
IC0205 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,523 | $30 | Implemented |
IC0205 # 03 Y:2018 | 03 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,439 | $0 | Implemented |
IC0205 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,390 | $4,470 | Implemented |
IC0205 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,600 | $1,769 | Implemented |
LE0402 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $887 | $4,200 | Implemented |
LE0402 # 06 Y:2015 | 06 | 2015 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $6,037 | $22,000 | Implemented |
LE0402 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,975 | $9,063 | Implemented |
LE0402 # 04 Y:2015 | 04 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,700 | $21,000 | Implemented |
LE0402 # 05 Y:2015 | 05 | 2015 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,557 | $4,800 | Implemented |
OK0924 # 03 Y:2015 | 03 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $309 | $0 | Implemented |
OK0924 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,037 | $21,108 | Implemented |
OK0924 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,674 | $0 | Implemented |
OK0924 # 04 Y:2015 | 04 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $408 | $1,137 | Implemented |