IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

259

matching recommendations
Reset
SIC 3452 Bolts, Nuts, Rivets, And Washers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0109 # 08 Y:1991 08 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $374 $180 Implemented
RU0109 # 09 Y:1991 09 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $509 $500 Implemented
RU0109 # 10 Y:1991 10 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,121 $0 Implemented
RU0113 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,496 $0 Implemented
RU0113 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,138 $330 Implemented
RU0113 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,196 $1,735 Implemented
RU0113 # 04 Y:1991 04 1991 COVER OPEN TANKS $506 $1,164 Implemented
RU0113 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,454 $0 Implemented
RU0113 # 06 Y:1991 06 1991 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,916 $11,500 Implemented
RU0113 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,091 $500 Implemented
RU0113 # 08 Y:1991 08 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,756 $6,800 Implemented
WI0108 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,400 $10,000 Implemented
WI0108 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $232 Implemented
WI0108 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,190 $400 Implemented
WI0108 # 04 Y:1991 04 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $487 $250 Implemented
WI0108 # 05 Y:1991 05 1991 INSTALL STORM WINDOWS AND DOORS $758 $2,514 Implemented
WI0108 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $53 $190 Implemented
WI0108 # 07 Y:1991 07 1991 INSULATE BARE EQUIPMENT $271 $117 Implemented
WI0087 # 01 Y:1990 01 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $30,592 $500 Implemented
WI0087 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $3,371 $1,500 Implemented
WI0087 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,928 $1,000 Implemented
WI0087 # 07 Y:1990 07 1990 INSTALL STORM WINDOWS AND DOORS $344 $1,134 Implemented
WI0087 # 08 Y:1990 08 1990 INSTALL SET-BACK TIMERS $386 $400 Implemented
WI0087 # 09 Y:1990 09 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $285 $0 Implemented
WI0081 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $9,520 $1,250 Implemented