Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
656
matching recommendationsSIC | 3452 | Bolts, Nuts, Rivets, And Washers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0354 # 05 Y:2019 | 05 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,590 | $8,800 | Implemented |
MI0354 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $2,156 | $2,559 | Implemented |
MI0354 # 07 Y:2019 | 07 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $1,687 | $240 | Implemented |
MI0354 # 08 Y:2019 | 08 | 2019 | USE PHOTOCELL CONTROLS | $1,366 | $2,206 | Implemented |
MI0354 # 09 Y:2019 | 09 | 2019 | USE SOLAR HEAT TO HEAT WATER | $601 | $2,205 | Not Implemented |
MI0354 # 10 Y:2019 | 10 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $538 | $951 | Implemented |
MI0354 # 11 Y:2019 | 11 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $218 | $559 | Implemented |
MI0354 # 01 Y:2019 | 01 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $42,517 | $105,476 | Implemented |
WV0561 # 08 Y:2018 | 08 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $321 | $34 | Implemented |
WV0561 # 05 Y:2018 | 05 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,253 | $6,000 | Not Implemented |
WV0561 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,742 | $171 | Implemented |
WV0561 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,765 | $1,784 | Implemented |
WV0561 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,102 | $13,629 | Implemented |
WV0561 # 01 Y:2018 | 01 | 2018 | INSTALL SET-BACK TIMERS | $15,007 | $2,522 | Implemented |
WV0561 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $535 | $1,400 | Implemented |
WV0561 # 07 Y:2018 | 07 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $471 | $696 | Implemented |
IC0205 # 07 Y:2018 | 07 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,754 | $1,197 | Not Implemented |
IC0205 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,523 | $30 | Implemented |
IC0205 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $631 | $50 | Not Implemented |
IC0205 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $611 | $2,300 | Not Implemented |
IC0205 # 03 Y:2018 | 03 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,439 | $0 | Implemented |
IC0205 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,390 | $4,470 | Implemented |
IC0205 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,600 | $1,769 | Implemented |
BS0083 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $821 | $196 | Not Implemented |
BS0083 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,699 | $982 | Not Implemented |