IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

656

matching recommendations
Reset
SIC 3452 Bolts, Nuts, Rivets, And Washers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0138 # 03 Y:2014 03 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,006 $15,000 Not Implemented
MZ0138 # 04 Y:2014 04 2014 AIR CONDITION ONLY SPACE NECESSARY $3,570 $0 Not Implemented
MZ0138 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $358 $0 Implemented
BD0436 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $3,206 $6,300 Not Implemented
BD0436 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $2,974 $1,500 Implemented
BD0436 # 03 Y:2013 03 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,260 $40 Not Implemented
BD0436 # 04 Y:2013 04 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $918 $470 Not Implemented
BD0436 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $238 $20 Not Implemented
LE0363 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,031 $85,300 Implemented
LE0363 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $13,013 Not Implemented
LE0363 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,725 $20,280 Not Implemented
LE0363 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,978 $1,000 Implemented
LE0363 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,529 $2,139 Implemented
LE0363 # 06 Y:2013 06 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,405 $21,000 Not Implemented
LE0363 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,878 $3,800 Implemented
LE0363 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,215 $24,200 Not Implemented
LE0363 # 09 Y:2013 09 2013 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,848 $6,600 Not Implemented
LE0363 # 10 Y:2013 10 2013 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,751 $5,000 Not Implemented
LE0363 # 11 Y:2013 11 2013 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,613 $14,000 Not Implemented
LE0363 # 12 Y:2013 12 2013 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $29,646 $29,648 Not Implemented
BD0386 # 01 Y:2011 01 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $19,582 $16,000 Not Implemented
BD0386 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $19,115 $86,640 Not Implemented
BD0386 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,419 $28,476 Implemented
BD0386 # 04 Y:2011 04 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $11,046 $40,000 Not Implemented
BD0386 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,230 $3,000 Implemented