Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0628 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $305 | $290 | Implemented |
MA0628 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,591 | $4,000 | Implemented |
MA0628 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,555 | $2,800 | Implemented |
MA0628 # 01 Y:2008 | 01 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,924 | $18,000 | Implemented |
HO0204 # 02 Y:1999 | 02 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $901 | $0 | Implemented |
HO0204 # 13 Y:1999 | 13 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,250 | $120 | Implemented |
HO0204 # 10 Y:1999 | 10 | 1999 | MAINTAIN/ENLARGE A STOCK OF SPARE PARTS | $1,125 | $318 | Implemented |
HO0204 # 07 Y:1999 | 07 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,911 | $2,450 | Implemented |
HO0204 # 06 Y:1999 | 06 | 1999 | INSULATE FEEDWATER TANK | $526 | $438 | Implemented |
HO0204 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,583 | $16,842 | Implemented |
MA0353 # 02 Y:1996 | 02 | 1996 | RECYCLE CLEANING SOLVENT AND REUSE | $5,470 | $0 | Implemented |
MA0350 # 01 Y:1995 | 01 | 1995 | INSTALL SET-BACK TIMERS | $18,981 | $7,000 | Implemented |
MA0350 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $1,806 | $870 | Implemented |
MA0350 # 05 Y:1995 | 05 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,260 | $500 | Implemented |
MA0172 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $499 | $168 | Implemented |
MA0172 # 02 Y:1990 | 02 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,911 | $2,000 | Implemented |
MA0172 # 03 Y:1990 | 03 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,721 | $326 | Implemented |