Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0130 # 01 Y:1988 | 01 | 1988 | RECOVER AND REUSE COOLING WATER | $4,097 | $12,000 | Implemented |
CO0130 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $406 | $0 | Implemented |
CO0130 # 03 Y:1988 | 03 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,197 | $200 | Implemented |
CO0130 # 05 Y:1988 | 05 | 1988 | COVER OPEN TANKS | $1,520 | $300 | Implemented |
CO0130 # 06 Y:1988 | 06 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $744 | $200 | Implemented |
CO0130 # 07 Y:1988 | 07 | 1988 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $185 | $200 | Implemented |
CO0130 # 08 Y:1988 | 08 | 1988 | INSULATE BARE EQUIPMENT | $1,046 | $200 | Implemented |
CO0130 # 09 Y:1988 | 09 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,162 | $992 | Implemented |
UD0260 # 05 Y:1988 | 05 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,399 | $180 | Implemented |
UD0260 # 01 Y:1988 | 01 | 1988 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,647 | $500 | Implemented |
UD0263 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,295 | $9,000 | Implemented |
UD0263 # 05 Y:1988 | 05 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,981 | $1,500 | Implemented |
UD0263 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,423 | $1,000 | Implemented |
UD0263 # 01 Y:1988 | 01 | 1988 | OPTIMIZE PLANT POWER FACTOR | $4,019 | $15,000 | Implemented |
UD0260 # 03 Y:1988 | 03 | 1988 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,025 | $2,000 | Implemented |
UD0260 # 04 Y:1988 | 04 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,447 | $0 | Implemented |
CO0121 # 01 Y:1988 | 01 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,482 | $2,800 | Implemented |
CO0121 # 07 Y:1988 | 07 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,509 | $1,517 | Implemented |
CO0121 # 06 Y:1988 | 06 | 1988 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,817 | $250 | Implemented |
CO0121 # 05 Y:1988 | 05 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $567 | $500 | Implemented |
CO0121 # 04 Y:1988 | 04 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,341 | $2,000 | Implemented |
TN0341 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $1,849 | $128 | Implemented |
TN0341 # 05 Y:1988 | 05 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,054 | $0 | Implemented |
TN0341 # 07 Y:1988 | 07 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $429 | $1,600 | Implemented |
UD0259 # 01 Y:1988 | 01 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $182 | $0 | Implemented |