IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0263 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,534 $0 Not Implemented
UD0263 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,981 $1,500 Implemented
UD0263 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,295 $9,000 Implemented
TN0341 # 01 Y:1988 01 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,301 $11,508 Not Implemented
TN0341 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,849 $128 Implemented
TN0341 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,137 $1,750 Not Implemented
TN0341 # 04 Y:1988 04 1988 IMPROVE LUBRICATION PRACTICES $2,195 $1,650 Not Implemented
TN0341 # 05 Y:1988 05 1988 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,054 $0 Implemented
TN0341 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,646 $765 Not Implemented
TN0341 # 07 Y:1988 07 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $429 $1,600 Implemented
UD0259 # 01 Y:1988 01 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $182 $0 Implemented
UD0259 # 02 Y:1988 02 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $680 $0 Not Implemented
UD0259 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $168 $64 Implemented
CO0109 # 01 Y:1987 01 1987 RECOVER WASTE HEAT FROM EQUIPMENT $867 $1,200 Not Implemented
CO0109 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $573 $540 Implemented
CO0109 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $683 $900 Implemented
CO0109 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,672 $45 Implemented
CO0109 # 05 Y:1987 05 1987 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,517 $250 Implemented
CO0109 # 06 Y:1987 06 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,069 $500 Implemented
CO0109 # 07 Y:1987 07 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,647 $2,000 Implemented
CO0109 # 08 Y:1987 08 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $796 Implemented
UD0247 # 01 Y:1988 01 1988 COMBINE UTILITY METERS $1,416 $3,000 Not Implemented
UD0247 # 02 Y:1988 02 1988 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,816 $0 Implemented
UD0247 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $818 $2,000 Not Implemented
UD0247 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,332 $1,500 Implemented