IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0806 # 17 Y:2009 17 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,995 $0 Implemented
UD0806 # 18 Y:2009 18 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $624 $1,000 Implemented
SF0371 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,854 $0 Implemented
SF0371 # 02 Y:2009 02 2009 REPAIR AND ELIMINATE STEAM LEAKS $850 $360 Implemented
SF0371 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $331 $0 Implemented
SF0371 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $265 $0 Implemented
SF0371 # 05 Y:2009 05 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $366 $417 Implemented
SF0371 # 06 Y:2009 06 2009 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $730 $1,240 Implemented
SF0371 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $1,052 $2,064 Implemented
SF0371 # 08 Y:2009 08 2009 INSULATE BARE EQUIPMENT $598 $1,218 Not Implemented
SF0371 # 09 Y:2009 09 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,056 $15,973 Implemented
SF0371 # 10 Y:2009 10 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,741 $38,621 Not Implemented
SF0371 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,353 $133,125 Implemented
UA0029 # 01 Y:2009 01 2009 USE PHOTOCELL CONTROLS $41 $109 Not Implemented
UA0029 # 02 Y:2009 02 2009 INSTALL TIMERS AND/OR THERMOSTATS $650 $1,416 Implemented
UA0029 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,785 $14,634 Implemented
UA0029 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $6,679 $2,900 Not Implemented
UA0029 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,613 $1,500 Not Implemented
UA0029 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,679 $0 Implemented
UA0029 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,902 $17,383 Implemented
UA0029 # 08 Y:2009 08 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $7,112 $109 Not Implemented
MZ0029 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,405 $900 Not Implemented
MZ0029 # 02 Y:2008 02 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,047 $0 Not Implemented
MZ0029 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,216 $900 Not Implemented
MZ0029 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,075 $43,400 Implemented