IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0029 # 05 Y:2008 05 2008 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6 $20 Implemented
IA0430 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,156 $23,886 Not Implemented
IA0430 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,291 Not Implemented
IA0430 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $388 $19 Implemented
IA0430 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,064 $1,045 Not Implemented
IA0430 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,111 $411 Implemented
IA0430 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $444 Not Implemented
IA0430 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $648 $1,617 Implemented
UD0786 # 01 Y:2008 01 2008 AIR CONDITION ONLY SPACE NECESSARY $33,340 $66,680 Implemented
UD0786 # 02 Y:2008 02 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,751 $15,000 Implemented
UD0786 # 03 Y:2008 03 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,467 $5,000 Implemented
UD0786 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,109 $9,240 Implemented
UD0786 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,446 $0 Implemented
UD0786 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,387 $1,280 Implemented
UD0786 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,608 $5,812 Not Implemented
UD0786 # 08 Y:2008 08 2008 INSTALL REPLACEMENT DOORS $1,292 $7,600 Not Implemented
UD0786 # 09 Y:2008 09 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,154 $0 Implemented
UD0786 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $927 $140 Not Implemented
UD0786 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $303 $1,000 Implemented
MA0628 # 01 Y:2008 01 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,924 $18,000 Implemented
MA0628 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,555 $2,800 Implemented
MA0628 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,591 $4,000 Implemented
MA0628 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $566 $2,285 Not Implemented
MA0628 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $305 $290 Implemented
UD0770 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $309,378 $0 Implemented