IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0369 # 05 Y:2010 05 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,318 $21,700 Implemented
UM0328 # 13 Y:2007 13 2007 INSULATE BARE EQUIPMENT $493 $307 Not Implemented
UM0328 # 12 Y:2007 12 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $515 $1,000 Not Implemented
UM0328 # 11 Y:2007 11 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,083 $1,350 Not Implemented
UM0328 # 09 Y:2007 09 2007 INSULATE BARE EQUIPMENT $2,032 $1,604 Not Implemented
UM0328 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $2,167 $644 Not Implemented
UM0328 # 10 Y:2007 10 2007 INSULATE BARE EQUIPMENT $1,625 $1,238 Implemented
UM0328 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,637 $50,000 Not Implemented
UM0328 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,450 $1,000 Not Implemented
UM0328 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,079 $45,000 Not Implemented
UM0328 # 04 Y:2007 04 2007 COVER OPEN TANKS $5,154 $1,500 Not Implemented
UM0328 # 03 Y:2007 03 2007 OPTIMIZE PLANT POWER FACTOR $6,128 $8,790 Not Implemented
UM0328 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,957 $4,000 Not Implemented
UM0328 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,110 $1,000 Implemented
UM0302 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $41,312 $7,600 Not Implemented
UM0302 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $9,991 $1,000 Implemented
UM0302 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,381 $1,500 Implemented
UM0302 # 08 Y:2006 08 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $387 $25 Implemented
UM0302 # 07 Y:2006 07 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,184 $845 Implemented
UM0302 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,331 $2,000 Not Implemented
UM0302 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,420 $1,500 Not Implemented
UM0302 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,195 $7,724 Not Implemented
UM0299 # 01 Y:2006 01 2006 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $36,291 $720 Implemented
UM0299 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,496 $8,700 Implemented
UM0299 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,108 $9,353 Implemented