IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0941 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $0 Implemented
UD0941 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $930 $2,000 Not Implemented
UD0941 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $943 $3,250 Not Implemented
UD0941 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,067 $0 Implemented
UD0941 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $3,537 $50 Implemented
UD0941 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,109 $4,500 Not Implemented
UD0941 # 04 Y:2016 04 2016 DEVELOP A REPAIR/REPLACE POLICY $41 $285 Implemented
UD0941 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,441 $0 Implemented
UD0941 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Implemented
UD0941 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,010 $4,150 Not Implemented
UD0920 # 06 Y:2015 06 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $47,012 $0 Not Implemented
UD0920 # 05 Y:2015 05 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,374 $0 Not Implemented
UD0920 # 04 Y:2015 04 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,654 $600 Not Implemented
UD0920 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $3,626 $200 Not Implemented
UD0920 # 02 Y:2015 02 2015 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,749 $0 Not Implemented
UD0920 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $13,359 $0 Implemented
UD0920 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,116 $0 Not Implemented
UD0920 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,293 $25,800 Not Implemented
UD0920 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,453 $20,680 Not Implemented
UD0920 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,355 $3,835 Not Implemented
UD0920 # 11 Y:2015 11 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,244 $0 Not Implemented
UD0920 # 12 Y:2015 12 2015 CONVERT TO AQUEOUS CLEANING SYSTEM $6,095 $7,375 Implemented
WV0495 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,156 $725 Implemented
WV0495 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,890 $5,211 Implemented
WV0495 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $5,177 $5,764 Implemented