IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0299 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,706 $738 Implemented
UM0299 # 05 Y:2006 05 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,156 $25 Implemented
UM0299 # 06 Y:2006 06 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,389 $2,750 Not Implemented
UM0299 # 07 Y:2006 07 2006 INSTALL SKYLIGHTS $208 $184 Implemented
UM0295 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,040 $1,200 Implemented
UM0295 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $80,138 $170,000 Implemented
UM0295 # 02 Y:2006 02 2006 OPTIMIZE PLANT POWER FACTOR $71,400 $75,000 Not Implemented
UM0295 # 03 Y:2006 03 2006 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $15,365 $1,130 Not Implemented
UM0295 # 04 Y:2006 04 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,656 $5,250 Not Implemented
UM0295 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $878 $736 Not Implemented
UM0295 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $1,316 $1,860 Not Implemented
UM0295 # 08 Y:2006 08 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,259 $3,080 Not Implemented
UM0295 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,767 $13,877 Not Implemented
UM0295 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,859 $2,400 Not Implemented
UM0258 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,480 $500 Not Implemented
UM0258 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $2,720 $5,925 Not Implemented
UM0258 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,963 $2,000 Not Implemented
UM0258 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $4,117 $7,220 Not Implemented
UM0258 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,828 $900 Not Implemented
UM0258 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,545 $1,275 Not Implemented
UM0258 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,300 $15,300 Not Implemented
UM0258 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,426 $500 Not Implemented
UM0257 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $200 Implemented
UM0257 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,370 $300 Implemented
UM0257 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $2,448 $300 Implemented