Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0226 # 05 Y:2003 | 05 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,160 | $500 | Not Implemented |
UM0226 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,111 | $375 | Not Implemented |
UM0226 # 07 Y:2003 | 07 | 2003 | OPTIMIZE PLANT POWER FACTOR | $2,055 | $1,560 | Not Implemented |
UM0226 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,722 | $1,000 | Not Implemented |
UM0226 # 09 Y:2003 | 09 | 2003 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $1,207 | $600 | Not Implemented |
UM0226 # 10 Y:2003 | 10 | 2003 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $724 | $400 | Not Implemented |
UM0226 # 11 Y:2003 | 11 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,004 | $2,200 | Not Implemented |
UM0226 # 12 Y:2003 | 12 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $164 | $0 | Not Implemented |
UM0225 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,181 | $750 | Not Implemented |
UM0225 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,809 | $5,500 | Not Implemented |
UM0225 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,040 | $6,081 | Not Implemented |
UM0225 # 04 Y:2003 | 04 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,500 | $4,000 | Not Implemented |
UM0225 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $80 | $0 | Not Implemented |
UD0660 # 01 Y:2003 | 01 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $280,000 | $58,320 | n/a |
UD0660 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,779 | $0 | Implemented |
UD0660 # 03 Y:2003 | 03 | 2003 | FILTER AND REUSE HYDRAULIC OIL | $19,375 | $4,323 | Not Implemented |
UD0660 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,291 | $7,000 | Not Implemented |
UD0660 # 05 Y:2003 | 05 | 2003 | REDUCE VENTILATION AIR | $8,388 | $15,000 | Implemented |
UD0660 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,666 | $1,124 | Not Implemented |
UD0660 # 07 Y:2003 | 07 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,568 | $6,545 | Not Implemented |
UD0660 # 08 Y:2003 | 08 | 2003 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $5,026 | $8,400 | Implemented |
UD0660 # 09 Y:2003 | 09 | 2003 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,983 | $14,150 | Not Implemented |
UD0660 # 10 Y:2003 | 10 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,648 | $0 | Not Implemented |
UD0660 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,905 | $7,338 | Not Implemented |
UD0660 # 12 Y:2003 | 12 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,763 | $3,318 | Implemented |