IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0660 # 13 Y:2003 13 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,019 $4,158 Not Implemented
UD0660 # 14 Y:2003 14 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,707 $0 Not Implemented
UD0660 # 15 Y:2003 15 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,443 $1,000 Implemented
UD0660 # 16 Y:2003 16 2003 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,260 $0 Implemented
UD0660 # 17 Y:2003 17 2003 INSTALL OCCUPANCY SENSORS $1,080 $4,200 Not Implemented
UD0660 # 18 Y:2003 18 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $946 $2,442 Not Implemented
UD0660 # 19 Y:2003 19 2003 INSTALL OCCUPANCY SENSORS $256 $167 Not Implemented
UD0660 # 20 Y:2003 20 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $150 $0 Implemented
OK0653 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,582 $600 Not Implemented
OK0653 # 04 Y:2003 04 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,904 $13,860 Not Implemented
OK0653 # 05 Y:2003 05 2003 INSTALL SET-BACK TIMERS $5,337 $3,280 Not Implemented
OK0653 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $25,432 $4,800 Not Implemented
OK0653 # 07 Y:2003 07 2003 AUTOMATE FINISHING PROCESS $36,680 $73,250 Not Implemented
OK0653 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,530 $6,844 Not Implemented
OK0653 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $14,697 $8,210 Implemented
UD0658 # 01 Y:2002 01 2002 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $962,280 $448,000 Implemented
UD0658 # 02 Y:2002 02 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $20,837 $16,100 Implemented
UD0658 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,063 $8,000 Implemented
UD0658 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,863 $1,050 Not Implemented
UD0658 # 05 Y:2002 05 2002 USE RADIANT HEATER FOR SPOT HEATING $4,586 $7,938 Not Implemented
UD0658 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,826 $8,905 Not Implemented
UD0658 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $749 $0 Not Implemented
WI0429 # 01 Y:2002 01 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $49,518 $23,000 Not Implemented
WI0429 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $11,200 $25,000 Not Implemented
WI0429 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $3,559 $2,900 Not Implemented