IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0376 # 01 Y:2000 01 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,857 $600 n/a
WI0376 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,771 $10,971 n/a
WI0376 # 03 Y:2000 03 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,131 $0 n/a
WI0376 # 04 Y:2000 04 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,172 $100 n/a
WI0376 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,954 $1,000 n/a
WI0376 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,719 $4,000 n/a
WI0376 # 07 Y:2000 07 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,375 $5,600 n/a
WI0376 # 08 Y:2000 08 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,691 $2,600 n/a
WI0376 # 09 Y:2000 09 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,425 $1,124 n/a
WI0376 # 10 Y:2000 10 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $912 $1,364 n/a
WI0376 # 11 Y:2000 11 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,109 $420 n/a
WI0376 # 12 Y:2000 12 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $740 n/a
WI0376 # 13 Y:2000 13 2000 INSTALL AUTOMATIC STACK DAMPER $904 $900 n/a
WI0376 # 14 Y:2000 14 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $770 $0 n/a
AM0370 # 01 Y:2000 01 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $222,000 $0 Not Implemented
AM0370 # 02 Y:2000 02 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $48,780 $500 Not Implemented
AM0370 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,700 $74,740 Implemented
AM0370 # 04 Y:2000 04 2000 REDUCE OR ELIMINATE WASTE $17,500 $2,120 Implemented
AM0370 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $26,200 $2,200 Not Implemented
AM0370 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,950 $500 Implemented
AM0370 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $6,870 $0 Implemented
AM0370 # 08 Y:2000 08 2000 $5,390 $0 Implemented
AM0370 # 09 Y:2000 09 2000 INSTALL SKYLIGHTS $4,700 $3,520 Not Implemented
AM0370 # 10 Y:2000 10 2000 INSTALL SKYLIGHTS $3,500 $13,900 Not Implemented
AM0370 # 11 Y:2000 11 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,425 $20 Not Implemented