IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0083 # 01 Y:1997 01 1997 REDUCE VENTILATION AIR $2,435 $4,400 Not Implemented
BD0083 # 02 Y:1997 02 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,943 $1,860 Implemented
BD0083 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,552 $2,800 Implemented
BD0083 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,241 $450 Implemented
BD0083 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,122 $1,740 Not Implemented
BD0083 # 06 Y:1997 06 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $455 $529 Implemented
BD0083 # 07 Y:1997 07 1997 USE SYNTHETIC LUBRICANT $398 $175 Implemented
BD0083 # 08 Y:1997 08 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $348 $0 Implemented
BD0083 # 09 Y:1997 09 1997 RECOVER AND REUSE COOLING WATER $10,457 $10,250 Not Implemented
BD0083 # 10 Y:1997 10 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,653 $750 Not Implemented
BD0083 # 11 Y:1997 11 1997 MINIMIZE WATER USAGE $642 $875 Not Implemented
BD0083 # 12 Y:1997 12 1997 INSTALL SENSORS TO DETECT DEFECTS $2,600 $725 Implemented
NV0078 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $878 $54 Not Implemented
NV0078 # 02 Y:1997 02 1997 INSTALL TIMERS AND/OR THERMOSTATS $7,471 $2,850 Not Implemented
NV0078 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $146 $186 Implemented
NV0078 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $360 Not Implemented
NV0078 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $691 $70 Not Implemented
NV0078 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,156 $400 Implemented
NV0078 # 07 Y:1997 07 1997 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $645 $589 Implemented
NV0078 # 08 Y:1997 08 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $111,690 $110,000 Implemented
NV0078 # 09 Y:1997 09 1997 ADOPT IN-HOUSE MATERIAL GENERATION $60,000 $50,000 Not Implemented
NV0078 # 10 Y:1997 10 1997 PAY BILLS ON TIME TO AVOID LATE FEES $438 $0 Implemented
NV0078 # 11 Y:1997 11 1997 RECOVER AND REUSE WASTE MATERIAL $3,600 $300 Not Implemented
NV0078 # 12 Y:1997 12 1997 RECOVER AND REUSE WASTE MATERIAL $1,200 $0 Implemented
BD0080 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,382 $8,810 Not Implemented