IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

203

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0538 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $1,000 Implemented
SD0538 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $29,703 $94,750 Not Implemented
SD0538 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $952 $750 Implemented
SD0538 # 02 Y:2016 02 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $17,613 $46,250 Implemented
SD0538 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $12,722 $54,880 Not Implemented
SD0538 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,200 $13,950 Implemented
SD0538 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,549 $26,272 Implemented
SD0538 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $877 $1,988 Not Implemented
SD0538 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $5,664 $2,520 Implemented
SD0526 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $2,988 $1,850 Not Implemented
SD0526 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $513 $2,320 Not Implemented
SD0526 # 03 Y:2016 03 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,404 $21,190 Not Implemented
SD0526 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,525 $47,892 Not Implemented
SD0526 # 07 Y:2016 07 2016 INSTALL SET-BACK TIMERS $14,249 $344 Not Implemented
SD0526 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,423 $1,500 Implemented
SD0526 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,558 $200 Not Implemented
SD0526 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,761 $1,620 Not Implemented
SD0526 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $47,293 $24,000 Implemented
SD0526 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,809 $31,775 Implemented
SD0526 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $140,004 $382,500 Not Implemented
SD0512 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,985 $5,247 Implemented
SD0512 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,697 $25,608 Implemented
SD0512 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,224 $2,850 Implemented
SD0512 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,532 $800 Implemented
SD0512 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,185 $45,900 Implemented