IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0482 # 10 Y:2001 10 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $64,110 $75,000 Not Implemented
CO0482 # 09 Y:2001 09 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $730 $2,000 Not Implemented
CO0482 # 08 Y:2001 08 2001 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $16,420 $730 Not Implemented
CO0482 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
CO0482 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $60 Implemented
CO0482 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $900 $1,500 Not Implemented
CO0482 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $990 $370 Implemented
CO0482 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,100 $210 Implemented
CO0482 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,800 $700 Not Implemented
CO0482 # 01 Y:2001 01 2001 IMPROVE COMBUSTION CONTROL CAPABILITY $5,120 $10,000 Not Implemented
CO0465 # 06 Y:2000 06 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $4,090 $7,960 Implemented
CO0465 # 08 Y:2000 08 2000 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $6,930 $6,000 Not Implemented
CO0465 # 09 Y:2000 09 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,460 $250 Not Implemented
CO0465 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,540 $16,000 Not Implemented
CO0465 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $750 $350 Implemented
CO0465 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $280 $0 Not Implemented
CO0465 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,190 $7,500 Not Implemented
CO0465 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,350 $400 Implemented
CO0465 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,240 $1,210 Implemented
CO0130 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $200 Implemented
CO0130 # 07 Y:1988 07 1988 DIRECT WARMEST AIR TO COMBUSTION INTAKE $185 $200 Implemented
CO0130 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $1,046 $200 Implemented
CO0130 # 05 Y:1988 05 1988 COVER OPEN TANKS $1,520 $300 Implemented
CO0130 # 04 Y:1988 04 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,756 $500 Not Implemented
CO0130 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,197 $200 Implemented