Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
245
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0225 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,600 | $105 | Not Implemented |
IC0225 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,711 | $3,850 | Not Implemented |
IC0225 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,947 | $3,110 | Implemented |
IC0225 # 07 Y:2019 | 07 | 2019 | USE RADIANT HEATER FOR SPOT HEATING | $10,365 | $18,280 | Not Implemented |
IC0225 # 01 Y:2019 | 01 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $44,444 | $23,100 | Implemented |
IC0225 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,274 | $4,150 | Implemented |
IC0225 # 06 Y:2019 | 06 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $2,596 | $652 | Implemented |
WM0060 # 01 Y:2015 | 01 | 2015 | REPLACE BOILER | $24,302 | $20,000 | Not Implemented |
WM0060 # 02 Y:2015 | 02 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,761 | $2,291 | Implemented |
WM0060 # 07 Y:2015 | 07 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $680 | $255 | Implemented |
WM0060 # 05 Y:2015 | 05 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $1,080 | $110 | Implemented |
WM0060 # 04 Y:2015 | 04 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $3,701 | $1,218 | Implemented |
WM0060 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $786 | $3,000 | Implemented |
WM0060 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,355 | $0 | Implemented |
BD0403 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $851 | $450 | Implemented |
BD0403 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,011 | $150 | Implemented |
BD0403 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $756 | $10 | Implemented |
BD0403 # 06 Y:2012 | 06 | 2012 | MINIMIZE WATER USAGE | $763 | $1,000 | Implemented |
BD0403 # 02 Y:2012 | 02 | 2012 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,936 | $440 | Not Implemented |
BD0403 # 08 Y:2012 | 08 | 2012 | AUTOMATE PAYROLL SYSTEM | $4,510 | $1,500 | Not Implemented |
BD0403 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,988 | $5,268 | Implemented |
BD0403 # 07 Y:2012 | 07 | 2012 | SELL OIL TO RECYCLER | $515 | $160 | Implemented |
BD0378 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $9,404 | $12,450 | Implemented |
BD0378 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,696 | $100 | Not Implemented |
BD0378 # 03 Y:2010 | 03 | 2010 | USE PHOTOCELL CONTROLS | $1,578 | $835 | n/a |