IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0350 # 07 Y:1995 07 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,050 $400 Not Implemented
MA0350 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,118 $2,813 Not Implemented
MA0350 # 01 Y:1995 01 1995 INSTALL SET-BACK TIMERS $18,981 $7,000 Implemented
MA0350 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $1,806 $870 Implemented
MA0350 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,705 $630 Not Implemented
MA0350 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,260 $500 Implemented
MA0350 # 02 Y:1995 02 1995 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $15,250 $28,000 Not Implemented
AR0072 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $655 $1,900 Implemented
AR0072 # 03 Y:1995 03 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $111,591 $250 Not Implemented
AR0072 # 04 Y:1995 04 1995 USE SHAFT TYPE FURNACES FOR PREHEATING INCOMING MATERIAL $165,880 $10,000 Not Implemented
AR0072 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $750 $0 Implemented
UM0042 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,676 $21,703 n/a
UM0042 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $7,633 $2,650 n/a
UM0042 # 05 Y:1995 05 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $8,994 $2,960 n/a
UM0042 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,959 $350 n/a
UM0042 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $27,333 $85,000 n/a
UM0042 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,315 $12,150 n/a
AR0069 # 09 Y:1995 09 1995 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $1,696 $0 Not Implemented
AR0069 # 07 Y:1995 07 1995 IMPROVE COMBUSTION CONTROL CAPABILITY $53,202 $25,000 Implemented
AR0069 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,300 $2,790 Implemented
AR0069 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,536 $5,120 Implemented
AR0069 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $968 $0 Implemented
AR0069 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,396 $1,564 Implemented
AR0069 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,401 $300 Implemented
AR0069 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,166 $200 Implemented