Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
70
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0170 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $64,245 | $22,000 | Not Implemented |
UM0170 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $709 | $1,660 | Implemented |
UM0170 # 05 Y:2000 | 05 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,573 | $8,200 | Not Implemented |
UM0170 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,147 | $500 | Implemented |
UM0170 # 03 Y:2000 | 03 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $185,532 | $310,000 | Not Implemented |
MO0286 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $0 | Implemented |
MO0286 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,722 | $40 | Implemented |
MO0286 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,671 | $3,945 | Implemented |
MO0286 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,521 | $118 | Implemented |
MO0286 # 06 Y:2000 | 06 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,040 | $0 | Implemented |
MO0286 # 05 Y:2000 | 05 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $7,535 | $7,500 | Not Implemented |
MO0286 # 09 Y:2000 | 09 | 2000 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $5,360 | $3,700 | Implemented |
MO0286 # 07 Y:2000 | 07 | 2000 | BURN WASTE OIL FOR HEAT | $3,970 | $3,500 | Not Implemented |
MO0286 # 08 Y:2000 | 08 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $3,650 | $1,300 | Implemented |
CO0465 # 09 Y:2000 | 09 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,460 | $250 | Not Implemented |
CO0465 # 08 Y:2000 | 08 | 2000 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $6,930 | $6,000 | Not Implemented |
CO0465 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $280 | $0 | Not Implemented |
CO0465 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,540 | $16,000 | Not Implemented |
CO0465 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,190 | $7,500 | Not Implemented |
CO0465 # 03 Y:2000 | 03 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,240 | $1,210 | Implemented |
CO0465 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,350 | $400 | Implemented |
CO0465 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $750 | $350 | Implemented |
CO0465 # 06 Y:2000 | 06 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $4,090 | $7,960 | Implemented |
WI0376 # 14 Y:2000 | 14 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $770 | $0 | n/a |
WI0376 # 01 Y:2000 | 01 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $3,857 | $600 | n/a |