IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0067 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,055 $0 Implemented
LM0067 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $418 $165 Implemented
LM0030 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $341,748 $600,000 Not Implemented
LM0030 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,500 $700,000 Not Implemented
LM0030 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $35,921 $34,056 Not Implemented
LM0030 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $789 $556 Not Implemented
LM0030 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,806 $350 Not Implemented
LM0030 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,427 $14,304 Not Implemented
LM0030 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,635 $17,700 Not Implemented
LM0030 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $115,143 $300 Implemented
LM0030 # 08 Y:2002 08 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,071 $175,000 Not Implemented
LM0030 # 09 Y:2002 09 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $600,000 $3,100 Not Implemented
LM0030 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,080 $224 Not Implemented
SD0216 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $25,245 $22,970 Not Implemented
SD0216 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,277 $1,650 Implemented
SD0216 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,961 $1,060 Implemented
SD0216 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $99,648 $111,600 Not Implemented
SD0216 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $840 $0 Implemented
SD0216 # 05 Y:1999 05 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,038 $1,500 Not Implemented
SD0216 # 06 Y:1999 06 1999 CONVERT TO AQUEOUS CLEANING $6,009 $6,009 Not Implemented
SD0216 # 07 Y:1999 07 1999 AUTOMATE FINISHING PROCESS $11,740 $4,100 Not Implemented