IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0225 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,711 $3,850 Not Implemented
IC0225 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,947 $3,110 Implemented
IC0225 # 07 Y:2019 07 2019 USE RADIANT HEATER FOR SPOT HEATING $10,365 $18,280 Not Implemented
IC0225 # 01 Y:2019 01 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $44,444 $23,100 Implemented
IC0225 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,274 $4,150 Implemented
IC0225 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,600 $105 Not Implemented
IC0225 # 06 Y:2019 06 2019 REPAIR OR REPLACE STEAM TRAPS $2,596 $652 Implemented
BD0325 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,908 $0 Not Implemented
BD0325 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,427 $9,000 Implemented
BD0325 # 07 Y:2007 07 2007 USE PHOTOCELL CONTROLS $4,835 $800 Implemented
BD0325 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,814 $3,375 Not Implemented
BD0325 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $505 Not Implemented
BD0325 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,183 $10,000 Not Implemented
BD0325 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,004 $2,000 Not Implemented
BD0325 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,418 $15,000 Not Implemented
BD0325 # 01 Y:2007 01 2007 USE RADIANT HEATER FOR SPOT HEATING $161,695 $11,200 Not Implemented
BD0237 # 09 Y:2003 09 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $12,480 $25,000 Not Implemented
BD0237 # 10 Y:2003 10 2003 PAY BILLS ON TIME TO AVOID LATE FEES $2,199 $0 Not Implemented
BD0237 # 01 Y:2003 01 2003 USE RADIANT HEATER FOR SPOT HEATING $32,297 $56,000 Not Implemented
BD0237 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,921 $5,000 Not Implemented
BD0237 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $4,857 $2,000 Not Implemented
BD0237 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,331 $0 Not Implemented
BD0237 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,365 $1,275 Not Implemented
BD0237 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $62,620 $10,000 Not Implemented
BD0237 # 07 Y:2003 07 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $39,936 $45,000 Not Implemented