IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0606 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $617,366 $36,000 Not Implemented
MA0606 # 12 Y:2006 12 2006 OPTIMIZE PLANT POWER FACTOR $14,940 $11,400 Not Implemented
MA0606 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,776 $27,573 Not Implemented
MA0606 # 10 Y:2006 10 2006 USE OPTIMUM TEMPERATURE $79,097 $21,125 Not Implemented
MA0606 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,360 $195,000 Not Implemented
MA0606 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130,688 $6,000 Implemented
MA0606 # 07 Y:2006 07 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $132,608 $196,800 Not Implemented
MA0606 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $89,232 $165,000 Not Implemented
MA0606 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $169,598 $120,520 Not Implemented
MA0606 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $285,051 $60,000 Not Implemented
MA0606 # 03 Y:2006 03 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $55,708 $2,000 Not Implemented
MA0606 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $298,083 $2,000 Not Implemented
MA0442 # 07 Y:1999 07 1999 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $257 $640 Implemented
MA0442 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $402 $955 Implemented
MA0442 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $964 $2,575 Implemented
MA0442 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,380 $11,544 Implemented
MA0442 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,396 $38,500 Implemented
MA0442 # 02 Y:1999 02 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $73,450 $125,600 Not Implemented
MA0442 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $186,395 $900,000 Not Implemented
MA0005 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $553 $62 Implemented
MA0005 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,212 $0 Implemented
MA0005 # 04 Y:1984 04 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,789 $140,000 Not Implemented
MA0005 # 03 Y:1984 03 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,993 $200 Implemented
MA0005 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $314 $0 Implemented