Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3462 | Iron And Steel Forgings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0606 # 01 Y:2006 | 01 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $617,366 | $36,000 | Not Implemented |
MA0606 # 12 Y:2006 | 12 | 2006 | OPTIMIZE PLANT POWER FACTOR | $14,940 | $11,400 | Not Implemented |
MA0606 # 11 Y:2006 | 11 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,776 | $27,573 | Not Implemented |
MA0606 # 10 Y:2006 | 10 | 2006 | USE OPTIMUM TEMPERATURE | $79,097 | $21,125 | Not Implemented |
MA0606 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $95,360 | $195,000 | Not Implemented |
MA0606 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130,688 | $6,000 | Implemented |
MA0606 # 07 Y:2006 | 07 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $132,608 | $196,800 | Not Implemented |
MA0606 # 06 Y:2006 | 06 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $89,232 | $165,000 | Not Implemented |
MA0606 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $169,598 | $120,520 | Not Implemented |
MA0606 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $285,051 | $60,000 | Not Implemented |
MA0606 # 03 Y:2006 | 03 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $55,708 | $2,000 | Not Implemented |
MA0606 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $298,083 | $2,000 | Not Implemented |
MA0442 # 07 Y:1999 | 07 | 1999 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $257 | $640 | Implemented |
MA0442 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $402 | $955 | Implemented |
MA0442 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $2,575 | Implemented |
MA0442 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,380 | $11,544 | Implemented |
MA0442 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,396 | $38,500 | Implemented |
MA0442 # 02 Y:1999 | 02 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $73,450 | $125,600 | Not Implemented |
MA0442 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $186,395 | $900,000 | Not Implemented |
MA0005 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $553 | $62 | Implemented |
MA0005 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $22,212 | $0 | Implemented |
MA0005 # 04 Y:1984 | 04 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $64,789 | $140,000 | Not Implemented |
MA0005 # 03 Y:1984 | 03 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,993 | $200 | Implemented |
MA0005 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $314 | $0 | Implemented |