Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 3462 | Iron And Steel Forgings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0640 # 01 Y:2023 | 01 | 2023 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $216,485 | $812,825 | Not Implemented |
WV0640 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,670 | $212,780 | Not Implemented |
WV0640 # 12 Y:2023 | 12 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $66 | $178 | Implemented |
WV0640 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $930 | $135 | Implemented |
WV0640 # 09 Y:2023 | 09 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,907 | $11,135 | Not Implemented |
WV0640 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $43,563 | $209,750 | Not Implemented |
WV0640 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,002 | $9,194 | Implemented |
WV0640 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,135 | $10,165 | Implemented |
WV0640 # 06 Y:2023 | 06 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,905 | $1,500 | Implemented |
WV0640 # 07 Y:2023 | 07 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $3,201 | $1,563 | Implemented |
WV0640 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,011 | $596 | Implemented |
WV0640 # 10 Y:2023 | 10 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,582 | $5,558 | Implemented |
WV0584 # 01 Y:2019 | 01 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $534,947 | $542,300 | Not Implemented |
WV0584 # 08 Y:2019 | 08 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $5,427 | $8,500 | Not Implemented |
WV0584 # 10 Y:2019 | 10 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,028 | $5,443 | Implemented |
WV0584 # 11 Y:2019 | 11 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $876 | $358 | Implemented |
WV0584 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $18,530 | $6,283 | Implemented |
WV0584 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $72,031 | $169,200 | Not Implemented |
WV0584 # 06 Y:2019 | 06 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $7,129 | $675 | Implemented |
WV0584 # 04 Y:2019 | 04 | 2019 | RECYCLE WHITE WATER | $26,110 | $17,500 | Not Implemented |
WV0584 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $44,593 | $129,500 | Implemented |
WV0584 # 07 Y:2019 | 07 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,503 | $1,000 | Implemented |
WV0584 # 09 Y:2019 | 09 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,899 | $510 | Implemented |
LE0468 # 06 Y:2019 | 06 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $726,896 | $16,000,000 | Implemented |
LE0468 # 02 Y:2019 | 02 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $76,637 | $55,000 | Implemented |