Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0170 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,573 $8,200 Not Implemented
UM0170 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $64,245 $22,000 Not Implemented
UM0170 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $185,532 $310,000 Not Implemented
UM0170 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,147 $500 Implemented
UM0170 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $709 $1,660 Implemented
AM0370 # 13 Y:2000 13 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $105 $0 Implemented
AM0370 # 01 Y:2000 01 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $222,000 $0 Not Implemented
AM0370 # 12 Y:2000 12 2000 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $675 $150 Implemented
AM0370 # 11 Y:2000 11 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,425 $20 Not Implemented
AM0370 # 10 Y:2000 10 2000 INSTALL SKYLIGHTS $3,500 $13,900 Not Implemented
AM0370 # 09 Y:2000 09 2000 INSTALL SKYLIGHTS $4,700 $3,520 Not Implemented
AM0370 # 08 Y:2000 08 2000 $5,390 $0 Implemented
AM0370 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $6,870 $0 Implemented
AM0370 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,950 $500 Implemented
AM0370 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $26,200 $2,200 Not Implemented
AM0370 # 04 Y:2000 04 2000 REDUCE OR ELIMINATE WASTE $17,500 $2,120 Implemented
AM0370 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,700 $74,740 Implemented
AM0370 # 02 Y:2000 02 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $48,780 $500 Not Implemented
AR0182 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $916 $1,360 Not Implemented
AR0182 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $351 $0 Implemented
AR0182 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $496 $180 Not Implemented
AR0182 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,868 $130 Implemented
AR0182 # 05 Y:2000 05 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $60,765 $150,000 Implemented
AR0182 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,468 $175 Implemented
AR0182 # 07 Y:2000 07 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $222,939 $244,000 Not Implemented