Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3462 | Iron And Steel Forgings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0429 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $514 | $150 | Implemented |
WI0429 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,146 | $1,280 | Not Implemented |
WI0429 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $3,559 | $2,900 | Not Implemented |
WI0429 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $11,200 | $25,000 | Not Implemented |
WI0429 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $49,518 | $23,000 | Not Implemented |
LE0140 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,492 | $0 | Not Implemented |
LE0140 # 05 Y:2002 | 05 | 2002 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $10,644 | $20,000 | Not Implemented |
LE0140 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,017 | $100 | Not Implemented |
LE0140 # 03 Y:2002 | 03 | 2002 | OPTIMIZE PLANT POWER FACTOR | $13,648 | $33,900 | Not Implemented |
LE0140 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,395 | $1,000 | Not Implemented |
LM0030 # 03 Y:2002 | 03 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $789 | $556 | Not Implemented |
LM0030 # 11 Y:2002 | 11 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,080 | $224 | Not Implemented |
LM0030 # 10 Y:2002 | 10 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $220,500 | $700,000 | Not Implemented |
LM0030 # 09 Y:2002 | 09 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $600,000 | $3,100 | Not Implemented |
LM0030 # 08 Y:2002 | 08 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $86,071 | $175,000 | Not Implemented |
LM0030 # 07 Y:2002 | 07 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $115,143 | $300 | Implemented |
LM0030 # 06 Y:2002 | 06 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $16,635 | $17,700 | Not Implemented |
LM0030 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,427 | $14,304 | Not Implemented |
LM0030 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,806 | $350 | Not Implemented |
LM0030 # 02 Y:2002 | 02 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $341,748 | $600,000 | Not Implemented |
LM0030 # 01 Y:2002 | 01 | 2002 | INSULATE BARE EQUIPMENT | $35,921 | $34,056 | Not Implemented |
LE0130 # 01 Y:2002 | 01 | 2002 | INSTALL OCCUPANCY SENSORS | $5,934 | $150 | Not Implemented |
LE0130 # 07 Y:2002 | 07 | 2002 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $105,753 | $60,000 | Not Implemented |
LE0130 # 06 Y:2002 | 06 | 2002 | IMPROVE LUBRICATION PRACTICES | $7,373 | $400 | Not Implemented |
LE0130 # 05 Y:2002 | 05 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,677 | $0 | Implemented |