IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0429 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $514 $150 Implemented
WI0429 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,146 $1,280 Not Implemented
WI0429 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $3,559 $2,900 Not Implemented
WI0429 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $11,200 $25,000 Not Implemented
WI0429 # 01 Y:2002 01 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $49,518 $23,000 Not Implemented
LE0140 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,492 $0 Not Implemented
LE0140 # 05 Y:2002 05 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,644 $20,000 Not Implemented
LE0140 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,017 $100 Not Implemented
LE0140 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $13,648 $33,900 Not Implemented
LE0140 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,395 $1,000 Not Implemented
LM0030 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $789 $556 Not Implemented
LM0030 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,080 $224 Not Implemented
LM0030 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,500 $700,000 Not Implemented
LM0030 # 09 Y:2002 09 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $600,000 $3,100 Not Implemented
LM0030 # 08 Y:2002 08 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,071 $175,000 Not Implemented
LM0030 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $115,143 $300 Implemented
LM0030 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,635 $17,700 Not Implemented
LM0030 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,427 $14,304 Not Implemented
LM0030 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,806 $350 Not Implemented
LM0030 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $341,748 $600,000 Not Implemented
LM0030 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $35,921 $34,056 Not Implemented
LE0130 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $5,934 $150 Not Implemented
LE0130 # 07 Y:2002 07 2002 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $105,753 $60,000 Not Implemented
LE0130 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $7,373 $400 Not Implemented
LE0130 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,677 $0 Implemented