Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 3462 | Iron And Steel Forgings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0770 # 11 Y:2007 | 11 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $448 | $5,050 | Implemented |
UD0770 # 10 Y:2007 | 10 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,532 | $0 | Implemented |
UD0770 # 09 Y:2007 | 09 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,139 | $300 | Implemented |
UD0770 # 08 Y:2007 | 08 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $7,672 | $42,117 | Implemented |
UD0770 # 07 Y:2007 | 07 | 2007 | INSTALL SKYLIGHTS | $8,153 | $30,000 | Implemented |
UD0770 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,018 | $40,083 | Not Implemented |
UD0770 # 05 Y:2007 | 05 | 2007 | OPTIMIZE PLANT POWER FACTOR | $14,976 | $120,000 | Not Implemented |
UD0770 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,512 | $2,280 | Implemented |
UD0770 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $40,049 | $2,700 | Implemented |
UD0770 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,879 | $52,520 | Implemented |
UD0770 # 01 Y:2007 | 01 | 2007 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $309,378 | $0 | Implemented |
BD0325 # 07 Y:2007 | 07 | 2007 | USE PHOTOCELL CONTROLS | $4,835 | $800 | Implemented |
BD0325 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $444 | $505 | Not Implemented |
BD0325 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,427 | $9,000 | Implemented |
BD0325 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,814 | $3,375 | Not Implemented |
BD0325 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,004 | $2,000 | Not Implemented |
BD0325 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,908 | $0 | Not Implemented |
BD0325 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $39,183 | $10,000 | Not Implemented |
BD0325 # 02 Y:2007 | 02 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,418 | $15,000 | Not Implemented |
BD0325 # 01 Y:2007 | 01 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $161,695 | $11,200 | Not Implemented |
BD0324 # 01 Y:2007 | 01 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $58,812 | $12,000 | Implemented |
BD0324 # 07 Y:2007 | 07 | 2007 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,688 | $2,500 | Implemented |
BD0324 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $219 | $270 | Implemented |
BD0324 # 05 Y:2007 | 05 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $526 | $300 | Implemented |
BD0324 # 04 Y:2007 | 04 | 2007 | USE PHOTOCELL CONTROLS | $594 | $200 | Implemented |