IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

642

matching recommendations
Reset
SIC 3465 Automotive Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0173 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,474 $5,695 Implemented
UA0173 # 06 Y:2017 06 2017 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $35,206 $1,000 Not Implemented
UA0173 # 07 Y:2017 07 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $21,010 $28,800 Not Implemented
UA0173 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,811 $150 Implemented
UM0469 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,139 $1,000 Not Implemented
UM0469 # 02 Y:2016 02 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,118 $5,200 Not Implemented
UM0469 # 03 Y:2016 03 2016 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,961 $20,000 Not Implemented
UM0469 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,415 $1,500 Not Implemented
UM0469 # 05 Y:2016 05 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $601 $1,000 Not Implemented
UK1602 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,037 $1,750 Not Implemented
UK1602 # 02 Y:2016 02 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $106,116 $60,000 Not Implemented
UK1602 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,180 $890 Not Implemented
UK1602 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $18,357 $3,168 Not Implemented
UK1602 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $922 $2,336 Not Implemented
UK1602 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $618 $151 Not Implemented
UK1602 # 07 Y:2016 07 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $667 $209 Not Implemented
UK1602 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,131 $80,175 Not Implemented
UK1602 # 09 Y:2016 09 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,902 $805 Not Implemented
UK1602 # 10 Y:2016 10 2016 CHANGE PRODUCT SPECS $3,827 $675 Not Implemented
UK1602 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $815 $0 Not Implemented
UK1602 # 12 Y:2016 12 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $23,450 $112,000 Not Implemented
UK1602 # 13 Y:2016 13 2016 OPTIMIZE PLANT POWER FACTOR $20,455 $26,250 Not Implemented
WV0520 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $279 $384 Implemented
WV0520 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $461 $428 Implemented
WV0520 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $773 $1,420 Not Implemented