Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
642
matching recommendationsSIC | 3465 | Automotive Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0173 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,474 | $5,695 | Implemented |
UA0173 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $35,206 | $1,000 | Not Implemented |
UA0173 # 07 Y:2017 | 07 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $21,010 | $28,800 | Not Implemented |
UA0173 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,811 | $150 | Implemented |
UM0469 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,139 | $1,000 | Not Implemented |
UM0469 # 02 Y:2016 | 02 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,118 | $5,200 | Not Implemented |
UM0469 # 03 Y:2016 | 03 | 2016 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,961 | $20,000 | Not Implemented |
UM0469 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,415 | $1,500 | Not Implemented |
UM0469 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $601 | $1,000 | Not Implemented |
UK1602 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,037 | $1,750 | Not Implemented |
UK1602 # 02 Y:2016 | 02 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $106,116 | $60,000 | Not Implemented |
UK1602 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,180 | $890 | Not Implemented |
UK1602 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,357 | $3,168 | Not Implemented |
UK1602 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $922 | $2,336 | Not Implemented |
UK1602 # 06 Y:2016 | 06 | 2016 | INSULATE BARE EQUIPMENT | $618 | $151 | Not Implemented |
UK1602 # 07 Y:2016 | 07 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $667 | $209 | Not Implemented |
UK1602 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,131 | $80,175 | Not Implemented |
UK1602 # 09 Y:2016 | 09 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,902 | $805 | Not Implemented |
UK1602 # 10 Y:2016 | 10 | 2016 | CHANGE PRODUCT SPECS | $3,827 | $675 | Not Implemented |
UK1602 # 11 Y:2016 | 11 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $815 | $0 | Not Implemented |
UK1602 # 12 Y:2016 | 12 | 2016 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $23,450 | $112,000 | Not Implemented |
UK1602 # 13 Y:2016 | 13 | 2016 | OPTIMIZE PLANT POWER FACTOR | $20,455 | $26,250 | Not Implemented |
WV0520 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $279 | $384 | Implemented |
WV0520 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $461 | $428 | Implemented |
WV0520 # 08 Y:2016 | 08 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $773 | $1,420 | Not Implemented |