IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 3465 Automotive Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2302 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $77,130 $820,000 n/a
UL2302 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,052 $8,500 n/a
UL2302 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $854 $975 n/a
UL2302 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $30,686 $20,580 n/a
UL2302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,825 $960 n/a
UL2302 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,425 $0 n/a
UL2302 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $149 $754 n/a
UL2302 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $427 $335 n/a
UK1602 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $815 $0 Not Implemented
UK1602 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,037 $1,750 Not Implemented
UK1602 # 13 Y:2016 13 2016 OPTIMIZE PLANT POWER FACTOR $20,455 $26,250 Not Implemented
UK1602 # 02 Y:2016 02 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $106,116 $60,000 Not Implemented
UK1602 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,180 $890 Not Implemented
UK1602 # 07 Y:2016 07 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $667 $209 Not Implemented
UK1602 # 09 Y:2016 09 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,902 $805 Not Implemented
UK1602 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $18,357 $3,168 Not Implemented
UK1602 # 10 Y:2016 10 2016 CHANGE PRODUCT SPECS $3,827 $675 Not Implemented
UK1602 # 12 Y:2016 12 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $23,450 $112,000 Not Implemented
UK1602 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $618 $151 Not Implemented
UK1602 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,131 $80,175 Not Implemented
UK1602 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $922 $2,336 Not Implemented
UK1501 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $2,481 $2,300 Not Implemented
UK1501 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,106 $0 Not Implemented
UK1501 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,967 $500 Implemented
UK1501 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,186 $7,500 Not Implemented