IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

460

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0786 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,446 $0 Implemented
UD0786 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,387 $1,280 Implemented
UD0786 # 09 Y:2008 09 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,154 $0 Implemented
UD0786 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $303 $1,000 Implemented
MA0628 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $305 $290 Implemented
MA0628 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,591 $4,000 Implemented
MA0628 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,555 $2,800 Implemented
MA0628 # 01 Y:2008 01 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,924 $18,000 Implemented
MS0315 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,069 $153 Implemented
WV0339 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,620 $11,160 Implemented
WV0339 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,951 $0 Implemented
WV0339 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3,744 $990 Implemented
WV0339 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $2,245 $370 Implemented
WV0339 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,423 $100 Implemented
WV0339 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,098 $1,270 Implemented
WV0339 # 10 Y:2006 10 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $583 $150 Implemented
WI0512 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,679 $72,610 Implemented
WI0512 # 04 Y:2006 04 2006 AUTOMATE PAYROLL SYSTEM $5,350 $0 Implemented
WI0512 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $843 $700 Implemented
WI0512 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $258 $150 Implemented
MS0277 # 11 Y:2005 11 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,286 $0 Implemented
MS0277 # 10 Y:2005 10 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,881 $0 Implemented
MS0277 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $3,550 $1,054 Implemented
MS0277 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,263 $0 Implemented
MS0277 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,820 $25,845 Implemented